Tailings and mining applications

A long-term improved solution

Mine final capping

Gas Drainage below the liner for a final capping

Quick connect System
Gas extraction – vacuum

Quantity to drain
Type of soil in contact
Length of drainage
Product
Low
Smooth
Standard
Standard
Agressive
Standard
High
Agressive
High

Runoff drainage on a liner for a final capping

High friction angle
No creep compression

Quantity to drain
Type of soil in contact
(Length of drainage)2 x Slope
Product
Standard
Smooth
≤150
Standard
Smooth
≥150
High
Agressive
≥150

Infiltration drainage (tailings without a liner)

High friction angle
No creep compression

Quantity to drain
Slope
Length of drainage
Permeability of the backfill
Product
Low
Plato
Short
Low
Average
3H:1V
Standard
Standard
High
Steep
Long
High

Lined Ponds

Gas or Ground water drainage below a liner

Quick connect System
No creep in compression
Leak Location compatible

Quantity to drain
Slope
Length of drainage
Water height
Product
Low
Plato
Short
Fixed
Average
3H:1V
Standard
Standard
High
Steep
Long
Variable

Leachate collection in storage ponds

AntiBiological Clogging Filter
No creep in compression

Contact us

Leak location on geomembranes

DRAINTUBE / DRAINTUBE Conductive project specific designed

Soil conductivity
Requested drainage
Life span of the system
Type of test
Product
Good
Yes
N/A
All
DRAINTUBE
Nul
Yes
Long
All
DRAINTUBE Conductive
Nul
No
Long
All

Dam drainage

Cycloned sand Dam drainages

Quick connect System
No gravel needed

Standard application

Tailings dewatering

DRAINTUBE / DRAINTUBE EKG project specific designed

Contact us